4166中国金沙-官方网站

Logistic Service
  • Taking advantage of the train transportation, load and delivery rapidly, ensure the quality and quantity. Provide the customers downstream with long-term stable and quality-assured supply.


  • 3 of the Group’s own coal loading stations, and the annual total delivery of the other 4 coal loading stations operating cooperatively with other parties is 15 Mt.


  • 3 self-operation loading stations located along Daqin Line, 100% ensure the delivery of self-produce coals and sourcing coals.



  • Yangyuan Loading Station
    •    Located in the main line of Daqing Railway with annual delivery capacity of 6 million tons and the storage capacity is 1 million tons. •    Yangyuan coal loading station has professional procurement, site management, railway planning, loading and transportation, and port team. With the above, loading of 8000-10,000 tons could be finished within three hours


  • Datong Loading Station
    •    Datong loading station is located in the main line of the Daqing Railway with annual delivery capacity of 4 million tons and the site storage capacity of 1.5 million tons. •    Datong station is mainly responsible for the procurement and transportation of Inner Mongolia coal.


  • Shuozhou Distribution Stations
    •    Located at the center of the largest coal station area in shuozhou, the four shuozhou collection and distribution stations are conveniently located in areas to which it only take 1 hour from our coal mines. •    The four generation stations provide special stock sites and priority delivery conditions, with an annual delivery capacity of 5 million tons.


Baidu
sogou